#1611eb1a-fc9f-4db7-9fd0-aecfa65d0bb5
0
0

Dynamic Interest Peg Stability Mechanism and Zap Vaults

dApps

By Giles Campbell, Nimi (@jesulonimi21)Session 3 • Awarded 3/10/2024

About the Proposal

This proposal outlines the development of innovative features within the xBacked ecosystem on Algorand. We aim to introduce a new peg mechanism with dynamic loan rates, ensuring the stability of the pegged value. Additionally, we plan to build a zap function for vaults, enabling users to bring one side of the LP, allowing the protocol to mint xUSD for the other side. These vaults will operate on an auto-compounding mechanism, gradually paying off loans and enhancing the ecosystem's resilience. # Project Components - Design and Implement Dynamic Loan Rate Mechanism: Develop a robust mechanism that dynamically adjusts loan rates based on the peg's stability. If xUSD depegs, falling below the desired $1 value the protocol interest rates will increase with the increase varying depending on the severity of the depeg. Integration with xUSD Protocol: Integrate the dynamic loan rate mechanism seamlessly into the xUSD protocol. Smart Contract Development: Develop and deploy smart contracts to enable the dynamic adjustment of loan rates. - Design and Development: Create a user-friendly zap function allowing users to bring only one side of a whitelisted LP, triggering the protocol to mint xUSD for the other side with the LP becoming collateral for the xUSD issued. Auto-Compounding Mechanism: Implement an auto-compounding feature within vaults to ensure continuous rewards are compounded into an increased collateral position. Security Audits and Testing: Conduct thorough security audits and extensive testing to ensure the reliability and safety of the zap function and auto-compounding mechanism.

Claim This Proposal

Checking Proposal Status
Verifying if this proposal has been claimed...

Progress Updates

Checking team membership...

Milestones

Proposal Planning

Define proposal scope and requirements

Completed: 11/24/2024

Phase 1

Implement core functionality for phase 1

Completed: 12/24/2024

Phase 2

Implement core functionality for phase 2

Completed: 1/23/2025

Final Delivery

Complete all deliverables and documentation

Completed: 2/22/2025

Comments

Please sign in to leave a comment.

No comments yet. Be the first to comment!

Proposal Summary

Funding
175,000 ALGO
xGov Period
Session 3
Status
Completed
Completion
100%
Community Votes
0
0

Team

Giles Campbell, Nimi (@jesulonimi21)

View all proposals by this team
Powered by VMkit